Admission to the work of SRO. List of works for which SRO admission is required

Before discussing the issue of jobs that require SRO admission, we will get acquainted with this topic. After all, the more the owner of a construction organization knows about all the working conditions, the easier it will be to provide his services to customers. To begin with, we will find out what this short abbreviation stands for and who should receive admission to the SRO's work. Useful information is never superfluous.

What is SRO?

These three letters are an abbreviation, which stands for self-regulating organization. In our case, this is a union of builders and designers, or more precisely, of enterprises and companies that perform these functions. The main task of this organization is to control the observance of the quality and professionalism of the services provided in the field of construction.

All entrepreneurs entering the SRO are required to pay a certain amount. The funds received in this way go to the compensation fund, which, if necessary, pays for compensation for damage caused by poor performance of work by any member of the SRO. That is, the organization is a kind of guarantor of the quality of the services provided, which, of course, raises the trust of its members from the customers. That is why, before starting cooperation with a particular company, customers of construction projects are interested in whether the company has SRO permits for construction work.

Why do I need to get access?

At present, membership in the SRO is a substitute for the license for the right to conduct construction work and performs the same function. Only organizations that have proven their professionalism and experience can become full participants in a self-regulatory organization. It should be noted that the selection is fairly strict - this allows you to weed out unscrupulous entrepreneurs at an early stage and protect consumers from poorly executed work. So, membership in the SRO is a proof of the competence of an organization.

The construction of new facilities, as well as major repairs of existing ones, should be carried out only by the masters of their business, otherwise this may lead to life-threatening and human health situations. Therefore, the experts compiled a list, including the types of work, the admission of SROs for the implementation of which is mandatory. We'll go to him later.

Who should receive admission?

As mentioned above, any enterprise that provides services for the construction, repair and reconstruction of buildings and other facilities should become a member of a self-regulatory organization. This condition is mandatory for those who want to provide the services listed under the existing legislation. Moreover, the admission to the work of the SRO should be obtained taking into account which services will be performed. For example, a company that has received permission to perform land or facade works, has no right to carry out project activities. For this it is necessary to obtain a special permit.

The work for which the SRO admission is required

The list below includes work that requires mandatory approval from a self-regulatory organization, regardless of the conditions under which they will be carried out.

  1. Installation of tracks and supports for construction cranes.
  2. Development of soil (except for mechanized), its artificial freezing, water depletion and surface water disposal.
  3. The arrangement of wells, oil wells and the construction of wells also can not be carried out if the organization does not receive admission to the work of the SRO.
  4. The device piles, grillage, strengthening the soil.
  5. Installation of prefabricated and erection of monolithic structures from reinforced concrete.
  6. Blasting and blasting.
  7. Creating structures from metal.
  8. Works on the protection of building structures.
  9. Installation and dismantling of gas supply systems, laying and testing of a water supply pipeline.
  10. Installation of external networks of gas supply, heat supply, sewerage and power supply.

List of other services for the implementation of which you need admission to work SRO

  1. Creation of objects of gas and oil industry.
  2. Various installation works.
  3. Commissioning works.
  4. Construction of airfields and highways.
  5. Device g. Etc. and tram ways.
  6. Construction of subways and tunnels.
  7. Creation of mine structures.
  8. The construction of overpasses, bridges and overpasses.
  9. Hydrotechnical and diving works.
  10. Creation of industrial furnaces and chimneys.
  11. Construction control.
  12. Organization of construction, major repairs or reconstruction.

When you do not need to get access

This list includes works whose admission is necessary only if they are performed on technically dangerous and other complex objects, a list of which can be found in the Town Planning Code of the Russian Federation (Article 48.1).

  1. Geodetic work.
  2. Preparatory work, except those listed in the first list.
  3. Mechanized soil development and its compaction by rollers.
  4. The device of stone and wooden structures, as well as roofs.
  5. Coating of building elements with paint and varnish materials for protective purposes.
  6. The device of internal engineering systems, heat insulation of pipelines.
  7. Facade work.
  8. Construction of power grids up to 1 kW.
  9. Creation of facilities for the use of atomic energy.
  10. Installation of automation and alarm systems, compressors and pumps, food, agricultural, electronic and medical equipment.
  11. Some types of commissioning:
  • Automation in power supply;
  • Autonomous and complex system setup;
  • Telemechanics;
  • Ventilation and air conditioning systems, as well as refrigeration systems;
  • Hot-water heating boilers.

Admission SRO for design work

When erecting new buildings or when renovating and overhauling the old ones, the responsibility for the construction is also great for engineers, who calculate all subsequent work. A small mistake in the drawings can cost lives to many people.

Therefore, there is a list of design services, for which it is also necessary to obtain SRO admission. The list of works is given below.

  1. Preparation of planning solutions for the organization of a construction site.
  2. Creation of architectural, constructive and technological solutions.
  3. Preparation of data on external and internal engineering networks and equipment.
  4. Development of special sections of the project, as well as those responsible for fire safety, environmental protection and providing access for low-mobility groups of citizens.
  5. Design of the organization of construction.
  6. Inspection of building structures.
  7. Organization of preparation of project documentation.

It is very important to get acquainted with all the lists in time and get all the necessary SRO admission to construction and design in time, so as not to violate one of the laws of the Russian Federation. After all, as is known, ignorance does not absolve from responsibility.