HomelinessDo it yourself

Quality metal tile - laying by own hands

Not every host wants to pay for a job that he himself is able to do. Among the many options for increasing the comfort in the house on a special place is the insulation of the roof. For such a case, metal tile is perfect . Stacking this material with your own hands implies a re- laying of the insulation. Thus, to make a house warm, you need to make a roof of high-quality and durable materials. Among the many options for the roof on a special account is metal. Self -tilting the roof is simple enough, if you follow the recommendations prescribed in the instructions.

Where to begin?

Before making a purchase of materials, it is necessary to calculate the metal tile, insulation, beams and other components from which we will make the roof. Let's first consider what the roof consists of. It is important to understand that the roof is a complex enough structure, therefore, if you do not follow the recommendations for mounting, there can be trouble with the climate in the house:

- Incorrectly woven insulation can create a "greenhouse effect", as a result of which the house will be cold, and in the attic - heat.

- Poorly attached metal tiles can cause the material sheets to fall when there is a strong wind or a lot of snow in the winter.

- The violations made during the fixing of the metal tile and the absence of an external waterproofing layer of the material can lead to the leakage of the roof.

- The inner layer of waterproofing contributes to the quality protection of the insulation from condensation. If you save and do not put the material, over time, glass wool will pick up moisture and stop protecting from the cold.

These and many other nuances are important to know in order to make the house warm.

Necessary equipment and tools

Roofing of metal with your own hands requires that you have many special tools. If you do not have them, you can rent or borrow from a neighbor. Complexities do not arise when working with such material as metal. Laying with your own hands can be done without the help of specialists. Important, That the proposed list of tools is available:

- equipment for cutting metal;

- portable electric screwdriver;

- a hammer;

- flat rake;

- marker;

Level.

For cutting metal, it is extremely undesirable to use the Bulgarian. Excellent conventional scissors for metal, saber saw or jig saw .

Installation of shingles

So you are at the most important stage in the project "metal tile: laying yourself." Now step by step explain the whole process of constructing the roof:

1. Determine the pitch of the rafters. Their frequency depends on the width of the heat-insulating plates.

2. The slope of the ramp should be above 14 degrees. This will allow precipitation to easily drain off the roof.

3. Do not forget to put the heater in the film waterproofing. This will save heat in the house and prevent the leakage of the roof.

4. Waterproofing material should be rolled on the rafters strictly horizontally.

5. Do the crate after you place the vapor barrier.

6. Install the metal tile. The main thing, remember that you need to move upwards, creating a flooring of one sheet on another about 15 centimeters.

7. Install the rain gutters.

Having done such steps, you will successfully block the roof of the house and achieve comfort in the winter.

Similar articles

 

 

 

 

Trending Now

 

 

 

 

Newest

Copyright © 2018 en.unansea.com. Theme powered by WordPress.