The construction schedule and its features

The calendar construction plan is one of the most important documents in the organization, planning and management in the design of construction projects. This document describes the installation and construction works and their main sequence, in accordance with the necessary time for their implementation, as well as the types of work and volumes.

Calendar construction plan Has a single main purpose, greatly simplifying the process of planning work. A schedule is created for the construction, which determines and technologically links various types of work done by different teams, taking into account the correct, timely and rational maintenance of these brigades with the necessary technical or material resources, mechanized machinery. Also, such a schedule allows you to achieve strict compliance with the deadlines for the completion of work, remember the exact time of commissioning. In addition, the construction industry is provided with constant material and technical support for the entire period of construction work.

During the construction of entire residential areas, microdistricts and individual complexes, the construction schedule Should always take into account the construction of individual houses or other buildings in combination with special facilities that provide constant service to people. Also, work should be carried out to carry out all engineering communications, landscaping, in accordance with the development project, which was approved.

During the preparation of the construction schedule, the entire complex of installation and construction work is taken into account in a generalized form. If the construction object is one, then all auxiliary and adjacent buildings are calculated, as well as existing highways, roads, engineering networks and other communications. Also takes into account the presence of a landscaped area around the facility, its gardening.

Let's consider the basic data and the conditions necessary for drawing up of a calendar schedule of works:

1. The conditions under which construction of objects and installation of separate structures is carried out.

2. The main source materials of the project, for example, master plan or survey, estimates, construction and technological drawings.

3. Accurate knowledge of the time required to complete all work.

4. A clear understanding of the scope of work and its cost.

5. Accessibility of basic building materials and structures, without which construction and installation work is impossible . And also an agreement on their delivery to the facilities.

6. Presence of agreed parts of construction projects within the organization and coordination of the project with various instances.

7. Availability of necessary normative, reference documentation and literature.

8. Issue of a building permit.

When drawing up a calendar schedule of work, it is first of all necessary to clearly detail the work that will be carried out during the construction. The main thing is that it is necessary to allocate absolutely all auxiliary buildings and buildings adjacent to the building under construction, as well as temporary structures, which are being built only for the period of construction.

Also it is necessary to take into account the price policy of the works, their volume, the need for building materials, special constructions. Based on all the above components, as well as taking into account the manpower to calculate man-hours, the first, the left part of the calendar plan for the construction of any object or group of objects is filled.

The construction schedule is a very important document, and its correct composition can greatly increase the efficiency of the construction project.