Solid fuel boiler connection: wiring diagram

If you decide to connect a solid fuel boiler, you will certainly need a diagram of these operations. When implementing these manipulations, you must follow certain rules that are necessary for the durable and safe operation of equipment. Recently, climatic conditions began to change drastically. Winter is getting colder, the temperature drops are more impressive. If you decide to connect a solid fuel boiler, the scheme presented in the article will help you with this. On how well the installation work will be done, the durability and reliability of the equipment will depend. It is possible to supplement the unit with a solid fuel boiler, as well as other devices that will meet the needs of the family. All these circumstances require a certain amount of space around the installation. If it is a question of reserve of free space, it is important to think about the distribution of heating pipes, which will go from the boiler. To make installation works independently is quite real, the main thing is to make calculations in advance and think through each stage.

Basic rules for installing the boiler

If a solid fuel boiler is connected, the circuit must first be considered, it will eliminate the occurrence of the most important errors. Initially, the master has to figure out where the boiler room will be located, and also how it will look. The room must necessarily have a good ventilation system, which will ensure the correct combustion process. It is also important what flooring will be in this room, it should consist of concrete, the thickness of which is 5 centimeters or more. Installation work must be accompanied by a first choice of location for the boiler. As the main disadvantage of such equipment is the need for mounting in a place where there is a lot of area around the perimeter of equipment for ventilation of the installation surface.

It is important to properly perform assembly work, which can be accompanied by some difficulties. If the unit has a high cost, then installation work is best entrusted to professionals, otherwise you may face additional costs.

Technology of installation works

Connecting a solid fuel boiler, the circuit of which you will need before carrying out the work, provides for the implementation of several stages, among them you can allocate the placement of equipment inside the boiler room. At the next stage, the pipeline system is laid, the piping is made, at the final stage there is the task of launching the boiler.

Basic requirements for the boiler room

Regardless of whether the installation work will be performed by specialists or the owner of a private house, the connection diagram of the solid fuel boiler must be observed. Otherwise, you may encounter problems that may arise during the operation of the equipment, they can cause serious damage not only to the boiler and installation, but also to your budget. To ensure the safe operation of the boiler equipment, it is necessary to choose a premise with a minimum area of 7 square meters. When equipping the boiler room with a ventilation system, it is necessary to select a channel section from 80 millimeters, which should account for 1 kilowatt of the power of a solid fuel boiler. It is important to ensure a safe standard distance from the wall to equipment, which should be 0.5 meters or more. Once you have considered the diagram of connecting a solid fuel boiler, it is important to think about what materials will be used for floor installation. They should be non-combustible, in front of the furnace opening there should be a non-combustible material of the type of metal. It is important to correctly choose the diameter of the chimney, this parameter is subject to certain requirements. You must comply with all standards of fire safety, only in this way it will be possible to ensure the correct operation of the device. The coefficient of efficiency of the heart of the heating system will depend on the correct installation and selection of the flue variety.

Advice from a specialist

The scheme of connection of a solid fuel boiler to the heating system, presented in the article, will allow you to make work without the help of specialists. This will help to save an impressive amount of money. However, in this case, you will not be able to count on a guarantee that covers work and equipment. Depending on the capacity and dimensions, as well as the volume of the furnace, the boiler can be unloaded manually or by means of a mobile crane. In this case, it is best to ensure that the installation was completed before the completion of the construction work. Only in this way you will be able to eliminate problems with the roof and doorways.

Preparing before installation

The scheme for connecting a solid fuel boiler to the heating system will allow you to install and connect the boiler yourself. Before carrying out installation work, it is necessary to perform calculations of boiler room parameters, taking into account the operation of the equipment and its features. The master must calculate the biases. It will be possible to make the distribution of pipes with a heat carrier, and also to solder the connecting elements, after thinking about the location of the expansion diaphragm tank for heating. The system can have a boiler. Specialists or the owner of the house should prepare a welding machine, plastic pipes, a special soldering iron for them, pipe scissors and some other tools, as well as materials.

The order of installation works

The connection of the gas and solid fuel boiler, the circuit of which will help you carry out the work, is made after preparation for the installation work. At the next stage, the equipment is placed in its final place, the strapping is carried out, which is the most difficult stage. The master will have to connect the communications, this involves installing a pipe that supplies water to the system, as well as return pipes, you will need to connect a pipe that will supply the water for heating. The scheme of connection of a solid fuel heating boiler assumes the tying in the system of some additional equipment by the type of the expansion tank. Do not forget about the need to equip the chimney, as well as the launch of equipment.

Some connection schemes

A number of masters use the scheme of parallel connection of a gas and solid fuel boiler. It is not always possible in such cases to mount a water pump to ensure forced circulation of the liquid. Some factors may serve as reasons for this. One of them is the frequent voltage drops in the network, which is quite difficult to combat. Quite often there are no power lines near the house. The price of such a system will be much lower due to the lack of additional equipment, but installation will require compliance with bias. Between the tank and the boiler in the heating system, it is recommended to install safety lines on the outlet and inlet pipes. At the same time, this element should be placed closer to the water heater. Among other things, the master should make sure that the expansion tank is connected to the boiler in the shortest possible way, it will not be possible to cut safety valves and cranes on it. If you are considering the connection scheme for a solid - fueled long -life boiler, it is important to note that in some cases it is not possible to raise the tank so that the circulation pump is embedded in a straight pipe. This will open the possibility of sucking in the upper air cooler.

More information about connection diagrams

The circulation pump must be installed on the return, or rather the return pipe. It must be installed near the heating boiler. This is necessary in order that in the event of a power failure the system continues its work without coercion. This unit should be installed along the bypass path, and if necessary it can be disconnected from the network, bypassing the bypass with the help of cranes.

Conclusion

Beforehand, you should definitely consider the scheme for connecting a solid fuel boiler. With an electric boiler, it is not necessary to neglect the installation of the bypass, which is a jumper with a crane located between the return and the supply. This element is necessary for returning excess water from the battery to the riser.