TechnologiesElectronics

For Electrical and Thermal Installation Specialists, Electrical Installation Devices

Specialists who are engaged in the operation of electrical and thermal installations. Electrical installation devices, technical operation of thermal power plants, use of gas and provision of gas supply services, application and testing of protective equipment used in electrical installations and other normative and technical documentation.

What if a supply company and an electricity consumer can not come to a mutual agreement when concluding an energy supply contract? This situation is regulated in detail in art.445 of the Civil Code of the Russian Federation and art.446 of the Civil Code of the Russian Federation. Parties that do not come to a mutual agreement on the specific terms of the contract at the conclusion of the electricity supply contract, the disagreements must be properly executed and be submitted to the arbitration court for consideration. In such situations, there is a general rule for all, under which only the consumer is entitled to handle the prepared claim in court for disagreements on specific individual conditions of the electricity contract.
Based on the following reasons, the sales company has every right to stop the supply of electricity. ESP has the right to cancel or interrupt the supply of electricity, the complete cessation or restriction of electricity supply in accordance with Art. 546 of the Civil Code of the Russian Federation in these cases:
1. For the systematic non-payment of tariff services (Article 523 of the Civil Code) - this is only for legal entities.
2. When checking and issued by the state inspector of electrical supervision in the event of a violation or improper condition of electrical equipment or in violation of safety regulations.
3. To prevent an accident at the facility.
4. To eliminate the accident that occurred at the site

For a person living in an apartment, the loss of light is an opportunity to spend a quiet evening by candlelight, but for the owner of a private house, the identification of problems with gas, heating, water supply, sewerage, ventilation and electricity is much more global. According to the rules for the installation of electrical installations (PUE), individual sites for development and private homes in the category of reliability of electricity supply are not very high priority, the third category. And this evenly means that during repairs or replacement of the element of the system that provides power supply to the site or house, such buildings can be left without electricity for a maximum of 24 hours. In private modern homes there are consumers whose work is very important for their activities in life. These include, first of all, electronic security and alarm systems. In the cold season, the heating system pump of a private house is added to the above-mentioned consumers.

The question of the required capacity is one of the most important determinants when choosing a power plant. It is calculated on the basis of the sums of capacity, or simultaneously included in the network of devices, or the most responsible energy consumers. At the time of launch, the power that is consumed increases fourfold. Many power plants allow short-term overload, but it is better, and sometimes necessary, to hedge, in advance providing for a power reserve of 30%. For emergency lighting and the operation of the refrigerator in most cases it is quite enough gasoline generator capacity of 2-3 kW + 2.0% power reserve. As an auxiliary source of electric power resources, single-phase generators can be used simple and unpretentious. The power plant, which has a three-phase input, serves to provide electricity to consumers with a three-phase input.

For each industrial enterprise, quality power supply is very important, because From this directly depends the success of the activities of the enterprise, the quality of products, as well as profit. The work on electricity supply should be handled only by professionals who have accumulated years of experience. This task is responsible and time-consuming, there are a lot of nuances in the issue of qualitative power supply to the enterprise.

Similar articles

 

 

 

 

Trending Now

 

 

 

 

Newest

Copyright © 2018 en.unansea.com. Theme powered by WordPress.